Apex Decks builds decks across Dayton and the Miami Valley, and this is what they actually cost here in 2026.
Most cost guides give a range so wide it is useless. This one is specific to this market and tells you where the money goes, so you can read a quote properly.
Where the money actually goes
On a typical 320 square foot elevated composite deck, the split lands roughly like this.
Labour, 35 to 45 percent
Digging, pouring, framing, decking, railing, stairs and cleanup. The largest single line and the one that does not change when you pick a different board.
Decking boards, 20 to 30 percent
The part everybody shops on. Moving from entry composite to premium composite usually moves the total by less than ten percent.
Railings, 12 to 25 percent
Priced per linear foot, and a deck’s perimeter does not scale with its area. A long narrow deck carries far more railing than a square one of the same size.
Framing lumber and hardware, 10 to 15 percent
Joists, beams, ledger, hangers, structural screws, joist tape. Not somewhere to save.
Footings and concrete, 5 to 10 percent
Digging, concrete, post bases and the footing inspection.
Permit and disposal, 3 to 6 percent
Permit fees vary by jurisdiction. Disposal applies on a replacement.
What drives a quote up
Height
Every foot of elevation adds post length, bracing, longer stairs and more railing. The jump from a ground level deck to one 6 feet up is far bigger than the square footage suggests, because at 30 inches the guard requirement kicks in and above that the stairs get long.
Stairs
Each stair run is stringers, treads, risers, a landing, footings for the landing, plus guards and a handrail on both sides. A second stair run typically adds 1,500 to 3,000 dollars. It is often the first thing to cut.
Shape
Every angle, curve, bump out and inset costs labour and wastes material. A rectangle is not a compromise, it is the shape that puts the most usable deck on the ground for the money.
Access
If a mini excavator cannot reach the back yard, the footings get dug by hand and the material gets carried. On a tight urban lot in Oakwood this is a real line item and an honest estimator will tell you about it rather than discovering it on day one.
Roofs and structures
A covered section or a screened porch is a different category of build, with bigger footings and roof framing, and it is priced separately.
What drives a quote down
Staying under 30 inches
No guard rail required. On a 320 square foot deck that can save 3,000 to 6,000 dollars, and it opens the view. Where the door height allows dropping the deck and adding one step down, this is the best value decision available.
One stair run instead of two
A simple rectangle
Treated now, composite later
Build the frame at 16 inch spacing so it is already correct for composite, deck it in treated today, and re deck over the same frame in ten or twelve years. The frame is the expensive part and you only build it once.
Autumn scheduling
Spring is when everyone calls. Late summer and autumn is where the availability is.
What never to cut
Footing depth, joist spacing and guard post attachment. Those three are the entire difference between a deck that lasts twenty five years and one that is a repair job in eight. They are also the three things a low quote is most likely to be quietly leaving out.
Ask every bidder to write down the footing depth, the joist spacing and how the guard posts attach to the frame. Most of the spread between quotes disappears once those are on paper.
Getting a number for your deck
The ranges above are honest averages, and your yard is not average. Access, grade, door height, soil and what you want out there all move the figure. We measure, talk through the options and put a written scope and price in your hand for free.
See deck design for what that process looks like, or deck building for how it gets built.
Deck cost in Dayton, OH
| Deck size | Pressure treated | Capped composite | Capped PVC |
|---|---|---|---|
| 12 by 12 ft, ground level | $5,200 to $8,400 | $9,000 to $13,500 | $11,500 to $16,500 |
| 16 by 20 ft, elevated | $11,500 to $18,000 | $19,000 to $29,000 | $24,000 to $36,000 |
| 20 by 24 ft, elevated | $17,000 to $27,000 | $28,000 to $43,000 | $35,000 to $54,000 |
| Multi level, 500 sq ft | $22,000 to $34,000 | $34,000 to $52,000 | $42,000 to $64,000 |
| Per square foot, all in | $34 to $58 | $58 to $92 | $72 to $115 |
| Add on | Typical cost | What it covers |
|---|---|---|
| Second stair run | $1,500 to $3,000 | Extra steps and handrail down a second side |
| Covered roof | $8,000 to $18,000 | Roof framing, posts and footings sized for the load |
| Under deck dry system | $4,000 to $9,000 | Drainage panels, ceiling and gutters under the deck |
Ranges are typical installed prices for the Miami Valley and include footings, framing, decking, railings and stairs unless noted. Your written estimate is the number that counts.
Estimate your own deck cost
Set the size and the finish and you get the installed range we work from, before anyone calls you. These are the same numbers as the tables above.
Typical installed range
$19,000$29,000
- Labour and installation$8,800
- Decking boards$6,000
- Railings$3,700
- Framing and hardware$2,800
- Footings and concrete$1,800
- Permit and disposal$900
Includes footings, framing, decking, railings and stairs. Oakwood access and Beavercreek clay can add a few percent. Not a quote: we measure for free and put a firm, written price in your hand.
Why homeowners pick Apex Decks
Footings below the frost line
Ohio ground heaves. Every post we set lands on a poured footing below the local frost depth, which is what keeps a deck level through a decade of freeze and thaw.
Permits and inspections handled
We pull the permit, meet the inspector and hand you the signed card. An unpermitted deck becomes your problem the day you sell the house.
Written scope before we start
Materials, framing spec, hardware, timeline and price in writing before anybody swings a hammer. No verbal change orders.
Deck Cost Guide questions we get asked
How much does a deck cost in Dayton in 2026?
A straightforward 320 square foot elevated deck in pressure treated pine runs roughly 11,500 to 18,000 dollars installed, and the same deck in capped composite runs roughly 19,000 to 29,000. All in, expect 34 to 58 dollars per square foot for treated and 58 to 92 for composite, including footings, framing, decking, railings and stairs. Ground level decks under 30 inches come in lower because they need no guard rail.
Why do deck quotes vary so much?
Usually because they are not quoting the same deck. The three things that most often differ are footing depth, joist spacing and how the guard posts attach. A quote that assumes surface blocks, 24 inch joist spacing and posts screwed through the decking will always be cheaper than one that pours footings below frost, frames at 16 inches and bolts posts to the frame. Ask each bidder to state those three items in writing and the spread usually explains itself.
What percentage of a deck's cost is the decking boards?
Less than people expect, usually around a quarter to a third of the total. Footings, framing, labour, railings and stairs make up the rest, and those do not get cheaper because you picked a cheaper board. That is why upgrading from an entry composite to a better one often adds less to the total than adding a second stair run does.
Does a deck add value to a house?
It generally recovers a meaningful share of its cost at resale and it is one of the more reliable outdoor improvements in that respect, though returns vary with the market and with how well the deck was built. A permitted deck in good condition helps. An unpermitted deck is a line item a buyer's agent will use, and it will cost you more at closing than the permit would have.
How can I bring the cost down without regretting it?
Four levers that do not compromise the build. Keep the deck under 30 inches above grade so no guard is required. Keep the shape rectangular, since every corner and angle costs labour. Use one stair run rather than two. Build in treated now on a frame spaced for composite, so you can upgrade the surface in ten years. What not to cut is footing depth, joist spacing or guard attachment.
When is the cheapest time to build a deck in Dayton?
Late summer through autumn. Everyone calls in March and April, so spring is where the schedule pressure and the premium sit. Autumn ground digs more easily than spring ground, material lead times are shorter, and you go into winter with the deck done and ready for the following season.
Are deck prices going up in 2026?
Trending up rather than down. Framing lumber has been running well above last year and imported softwood tariffs have added to the cost of treated stock, and composite makers have pushed through two rounds of increases since 2025. A quote that is valid today can be several hundred to a couple of thousand dollars different on a large deck by next season, which is one more reason not to wait on a project you already want. We hold a quoted price for a stated window and put that window in writing.