Catch the water at the joist line and the space under a raised deck becomes dry, usable patio. On a walkout basement it is often the best value square footage in the whole project.

  • Footings below the frost line
  • Permits and inspections handled
  • Written scope before we start

Apex Decks installs under deck drainage and ceiling systems across Dayton and the Miami Valley, turning the space beneath a raised deck into dry usable patio.

On a walkout lot this is the best value square footage in the whole project, and it is the upgrade most people have never heard of.

The two approaches

Above joist

A membrane or trough system laid over the top of the joists before the decking goes down. Water entering through the board gaps hits the membrane and runs out to a gutter at the perimeter. The joists stay exposed underneath, which reads as honest and rustic, and the system itself is invisible from below.

Cheaper, and it can only go in during a new build or a full re decking.

Below joist

Panels installed on the underside of the joists, sloped to a collection channel and a gutter. They are both the drainage and the ceiling. The framing is completely hidden, the finish is flat and clean, and lighting and fans can be recessed into it.

More expensive, and it works as a retrofit on almost any existing raised deck.

What you get out of it

Usable square footage

A dry ceiling turns the area under a deck into an outdoor room. On a typical walkout that is 250 to 400 square feet of covered patio, at a fraction of the cost of building new covered space.

A dry basement door

Water that would otherwise sheet off the deck edge and land at the back of the house instead gets collected and piped away from the foundation. On a walkout basement this is a real benefit and not a minor one.

Somewhere for the equipment

Lighting, ceiling fans, speakers and a television mount all become possible because there is a ceiling to fix them to and a cavity to run cable in. Wired during installation this is cheap. Added afterwards it means pulling panels.

Storage that stays dry

Even if you never furnish it, the mower, the cushions and the firewood stop getting rained on.

Doing it properly

Check the frame first

A ceiling under the deck makes the framing harder to inspect. Before we install one we check joist condition, hanger corrosion and beam bearing, because sealing a failing frame out of sight is how a small problem becomes a large one. If the frame needs repair, that happens first.

Ventilation

The cavity between the decking and the ceiling has to breathe. A sealed cavity holds humid air against the framing. Correct systems maintain airflow at the perimeter, and that is one of the differences between a manufactured system and a ceiling somebody screwed up under the joists.

Slope and gutter sizing

The panels need real fall to move water, and the gutter has to be sized for the whole deck area draining into it, not for a modest section of roof. An undersized gutter overflows in a heavy Ohio storm, which is exactly when the system is being judged.

Where the water goes

Downspouts have to discharge away from the deck footings and away from the foundation. Tying into an existing downspout run or a buried drain line is usually the neatest answer and it is part of what we plan.

Cost and when it makes sense

The economics work best when the deck is high enough to stand under comfortably and there is a door at the lower level, which describes most walkout lots in Beavercreek and Springboro.

It is also worth building into a new multi level deck from the start, because the above joist option is cheaper and the electrical can be roughed in while the frame is open.

Where we install under deck systems

Across Dayton, Oakwood, Kettering, Centerville, Beavercreek and Springboro.

Deck cost in Dayton, OH

Under deck drainage and ceiling systems in the Dayton area.
SystemCost per sq ftWhere the water is caughtFinish
Above joist membrane, new build only$10 to $18On top of the joists, under the deckingJoists stay visible
Below joist panel system$14 to $26Under the joistsPanels are the ceiling
Panel system plus finished ceiling$22 to $38Under the joistsPVC bead board or vinyl soffit
Add: gutters and downspout run$1,200 to $2,800PerimeterMatched to house gutters
Add: recessed lighting and fan$1,600 to $4,200n/aWired in the ceiling cavity

Ranges are typical installed prices for the Miami Valley and include footings, framing, decking, railings and stairs unless noted. Your written estimate is the number that counts.

Why homeowners pick Apex Decks

  • Footings below the frost line

    Ohio ground heaves. Every post we set lands on a poured footing below the local frost depth, which is what keeps a deck level through a decade of freeze and thaw.

  • Permits and inspections handled

    We pull the permit, meet the inspector and hand you the signed card. An unpermitted deck becomes your problem the day you sell the house.

  • Written scope before we start

    Materials, framing spec, hardware, timeline and price in writing before anybody swings a hammer. No verbal change orders.

Under Deck Systems questions we get asked

What is an under deck drainage system?

A set of channels or panels installed either on top of the joists before the decking goes down, or below the joists as a ceiling, that catch water passing through the deck board gaps and carry it to a gutter at the perimeter. The result is that the area underneath stays dry in rain, so it can hold furniture, a television or a dining table rather than a lawnmower.

Above joist or below joist?

Above joist systems go in during a new build or a re decking, cost less, and leave the joists visible underneath, which some people like and some do not. Below joist panel systems can be retrofitted to any existing deck, become the finished ceiling themselves, and hide the framing entirely. If your deck already exists, below joist is the practical answer.

Can this be added to a deck I already have?

A below joist panel system, yes, on almost any raised deck with enough height underneath. An above joist membrane needs the decking off, so it only makes sense if you are re decking anyway. We check the joist condition first, because sealing a ceiling under a frame that is rotting is not a favour to anyone.

How much headroom do I need?

Enough that the finished ceiling still leaves comfortable standing height, which in practice means the deck surface wants to be at least eight feet above the ground below for a below joist system with a finished ceiling. Below that, an above joist system that keeps the joists exposed preserves more height.

Will it stop water completely?

Rain falling straight through the deck, yes. Wind driven rain coming in from the sides still gets in, the same way it does on any covered patio, and that is what makes people add a windbreak or a partial wall on the weather side. We are honest that this makes the space dry, not sealed.

Does it cause the deck frame to rot?

Not when it is installed correctly, and this is the question worth asking. A properly designed system keeps water off the framing and stays ventilated so trapped moisture can escape. A cheap ceiling nailed under the joists with no drainage plane and no ventilation does exactly what people fear. Joist tape on the framing underneath is part of doing this right.